Mangley HEP

MANGLEY HYDRO ELECTRIC PROJECT – 2 MW


Mangley Hydro Electric Project is located on the Rongpochu Khola in the South Sikkim and Project was commissioned on July 2008. Project has two units of 1 MW each with a total capacity of 2 MW.

Project contains a Trench weir, desilting basin, 1600 m long 1 m dia Head Race Pipe, 3.5 m dia surge shaft, 914/650 mm dia penstock and a surface power house with 2 x 1000 kW horiz0ntal Francis turbine

Do you have a question?
Feel free to contact

spdcskm@gmail.com
+913592208186


SEND US A MESSAGE