LACHUNG HYDRO ELECTRIC PROJECT – 3 MW


Lachung Hydro Electric Project is located on the Shargophulchu Khola in the North Sikkim and Project was commissioned on January 2009. Project has two units of 1.5 MW each with a total capacity of 3 MW.

Project consist of a Trench weir, desilting basin, 1685 m long 900 mm dia water conductor, 2.5 M dia surge shaft, one no. 600- 900 mm dia penstock and a surface power house with 2 x 1500 kW horizontal Pelton turbine.